Fiscal Year 2012 Budget 147
Departmental BudgetCs aapnidta Nl Parrroagtriavmes
Reagan Memorial Tollway (I-88)
The current CRP budget for the Reagan Memorial Tollway is $950.3 million. At of the end of 2011,
an estimated $702.2 million will have been committed. The Reagan Memorial Tollway runs east-west
from Hillside to Rock Falls.
The 2012 Capital Budget for this corridor is $70.2 million to fund construction to rehabilitate and
repair pavement and bridges between IL Route 251 and IL Route 56, as well as reconstruct and widen
the Reagan Memorial from IL Route 56 to Deerpath Road. Work will include widening with one lane
in each direction and replacement of two lanes in each direction consisting of concrete pavement.
Veterans Memorial Tollway (I-355)
The Veterans Memorial Tollway is the newest of the four Tollways with the section from Army Trail
Road to I-55 opening in 1989. In November 2007, a new 12.5 mile extension opened connecting
I-55 to I-80 and lengthening the Veterans Memorial Tollway to 29.8 miles. At the end of 2011 more
than $827.1 million will be invested in widening, rehabilitating and extending the Veterans Memorial
Tollway as part of the CRP.
The 2012 capital budget for this corridor is $5.0 million to fund the replacement of the tunnel light-ing
under the Reagan Memorial Tollway (I-88) and for design services for resurfacing portions of the
pavement from I-55 to Army Trail Road.
Ronald Reagan Memorial Tollway (I-88)
Reconstruct
$10.1
Sub Total $10.1
Restore
$60.1
Sub Total $60.1
$70.2
Project Scope
Length
(miles)
Estimated
Construction Period
2012 Request
($ millions)
Resurface
Deerpath Road to IL 251
(MP 76.2 to 113.5) 3.2 2012-2013
Reconstruct / Add Lane
Deerpath Road to IL 56
(MP 113.3 to 114.3) 1 2012-2013
Ronald Reagan Memorial Tollway Total
Exhibit 92
Veterans Memorial Tollway (I-355)
Restore
Resurfacing $4.7
Sub Total $4.7
Regional Growth
South Extension I355 South Extension
(I-55 to I-80) $0.3
Sub Total $0.3
$5.0
I-55 to Army Trail Road 13.0 2009-2013
Project Scope
Length
(miles)
Estimated
Construction Period
12.5 2004-2013
Veterans Memorial Tollway Total
2012 Request
($ millions)
Exhibit 93