Fiscal Year 2009 Budget88
Departmental Budgets and Narratives Capital Program
Jane Addams Memorial Tollway (I-90)
The current CRP budget for the Jane Addams Memorial Tollway is $777 .3 million. The Jane Addams Memorial Tollway runs in a northwest direction from near O’Hare International Airport to near South Beloit. By the end of 2008 $177 .1 million is estimated to be expended, which includes approximately $140.3 million expended solely in 2008. The 2009 capital budget for the Jane Addams Memorial Corridor is $121.6 million.
By the end of 2009, the 14.3 mile section of the corridor north of Rockford will be widened from 2 to 3 lanes in each direction and the Cherry Valley Interchange at I-90/I-39 will be reconstructed and reconfigured to allow for more efficient traffic movements. Advance work was completed in late 2007, and in early 2008, the contracts required to reconstruct and widen the section of roadway from Newburg Road to Rockton Road in the eastbound direction were awarded. By late spring, all traffic was shifted to the westbound side of the road while the eastbound lanes are reconstructed. Westbound construction is scheduled in 2009.
The projects included in this Corridor consist of constructing a new, two-lane flyover ramp bridge over eastbound I-90, constructing a new ramp bridge over I-90 for westbound I-90 traffic heading southbound on I-39, removing and replacing the Newburg Road Bridge over I-90. Additionally, there are nine crossroad bridges over I-90 between the South Beloit Toll Plaza and Newburg Road that will be impacted by the reconstruct and widen projects along this corridor, including Elevator Road, Burr Oak Road, Belvidere Road, Swanson Road, Rock Cut State Park, Harlem Road, Spring Creek Road, Rote Road and State Street in Rockford. Additional maintenance projects to rehabilitate the section of the Jane Addams Memorial Tollway between O’Hare International Airport and Rockford are scheduled after 2010.
Jane Addams Memorial Tollway (I-90)Reconstruct$27.1$88.1Sub Total:$115.2Regional GrowthInterchange Improvement$6.5Sub Total:$6.5DesignMaster Plan forReconstruct / Add Lane$0.0Sub Total:$0.0Jane Addams Memorial Tollway Total:$121.6East Riverside Interchange Inter-Agency Project02008Kennedy Expressway to Newburg Road(MP 0.0 to 61.8) - Design Only61.82007-2009Reconstruct / Add LaneNewburg Road to Rockton Road (MP 61.8 to 76.1)14.32008-2009length (miles)Estimated Construction Period2009 Request(millions)Interchange ImprovementI-39/ I-90 Interchange (MP 60.8 to 62.4)02008-2009ProjectScope